Search
  • Elizabeth Hill

Tank Cleaning Project | Mt. Pleasent, TX

Lighthouse was awarded a contract to clean and remove crude oil sludge and basic water and sediment (BS&W) from several crude oil tanks located in Mount Pleasant, Texas. Three 55K bbl tanks, one 65K bbl tank and two 500 bbl tanks were cleaned as part of this project. Pumpabl fluids were first removed and hauled off-site for disposal and the sludge/solids were removed and transported to an on-site constructed land farm cell. Approximately 10,584 bbls. of sludge solids was removed from the tanks. Following the removal of the material in the tank, the interior tank services were cleaned with a degreaser and high pressure hot water washing system. This project was completed under budget and was ahead of schedule.


4 views0 comments

Recent Posts

See All